Examveda
Examveda

Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period?

A. direct

B. pilot

C. phased

D. parallel

E. None of the above

Answer: Option D


This Question Belongs to Computer Science >> System Analysis And Design

Join The Discussion

Related Questions on System Analysis and Design

System Study involves

A. study of an existing system

B. documenting the existing system.

C. identifying current deficiencies and establishing new goals

D. All of the above

E. None of the above