Which of the following term is best defined by the statement: "Derive traceability information to maximize information hiding in the design."?
A. Underestimated development time
B. Organizational restructuring
C. Requirements changes
D. None of the mentioned
Answer: Option C
Related Questions on Software Engineering
Which of the following is not a phase of the Software Development Life Cycle (SDLC)?
A. Planning
B. Analysis
C. Testing
D. Maintenance
What does UML stand for in software engineering?
A. Unified Modeling Language
B. Universal Modeling Language
C. Unique Modeling Language
D. Unified Management Language
Which software development model is also known as the linear-sequential life cycle model?
A. Agile
B. Waterfall
C. Spiral
D. RAD (Rapid Application Development)
In which phase of the SDLC is the feasibility study conducted?
A. Planning
B. Design
C. Implementation
D. Maintenance

Join The Discussion