Which project required rerouting due to discovery of fault zones?
A. Sydney Metro
B. Tokyo Shinkansen Tunnel
C. London Underground Jubilee Line
D. Crossrail Project
Answer: Option D
Solution (By Examveda Team)
The Crossrail Project in London had to reroute segments when active fault zones and complex urban geology were encountered.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation
Join The Discussion