Why was a tunnel chosen over a bridge in the Stockholm Bypass project?
A. Lower cost
B. Shorter route
C. Geological stability and aesthetics
D. Traffic constraints
Answer: Option C
Solution (By Examveda Team)
Due to dense urbanization and geological considerations, a tunnel provided better long-term stability and preserved the natural landscape.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation