Working coal in the pillars formed in the operation in bord and pillar mining is
A. Working in the borken
B. Slicing
C. Longwall Retreat
D. Working in the whole
Answer: Option A
A. Working in the borken
B. Slicing
C. Longwall Retreat
D. Working in the whole
Answer: Option A
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l
Join The Discussion