A profitability index (PI) of .95 for a project means
A. The project's costs (cash outlay) are less than the present value of the project's benefits
B. The project's NPV is greater than zero
C. The project's NPV is greater than one
D. The project returns are 95 paise in present value for each current rupee invested
Answer: Option D
The appropriate ratio for indicating liquidity crisis is
A. Operating ratio
B. Sales turnover ratio
C. Current ratio
D. Acid test ratio
A. Net present value method
B. Internal rate of return method
C. Profitablity index method
D. None of the above
A. a-4, b-3, c-1, d-2
B. a-3, b-4, c-1, d-2
C. a-2, b-3, c-1, d-4
D. a-3, b-2, c-4, d-1
Which one of the following assumptions is not included in the James E. Walter Valuation model?
A. All financing by retained earnings only
B. No change in the key variables such as EPS and DPS
C. The firm has finite life
D. All earnings are either distributed as dividends or invested internally immediately

Join The Discussion