Berms are provided in canals if these are
A. Fully in excavation
B. Partly in excavation and partly in embankment
C. Fully in embankment
D. All the above
Answer: Option B
Solution(By Examveda Team)
The correct answer is Option B: Partly in excavation and partly in embankment.In canal engineering, berms are provided when they are partly in excavation and partly in embankment. This is done to stabilize the slopes of the canal and prevent erosion. Berms act as horizontal shelves on the sides of the canal, providing support to the excavated and embanked portions.
Option A: Fully in excavation is incorrect because berms are not exclusively in excavation.
Option C: Fully in embankment is incorrect because berms are not exclusively in embankment.
Option D: All the above is incorrect because the correct condition for providing berms is when they are partly in excavation and partly in embankment, not fully in either.
Join The Discussion
Comments ( 2 )
Related Questions on Estimating and Costing
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above
Size, capacity and materials need be specified for
A. Bib-cocks
B. Stop-cocks
C. Ball valves
D. All the above
The expected out turn of 12 mm plastering with cement mortar is
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation
In SSC book it has given Ans - (a) fully in excavation and in examveda (b) partly exca. and partly in embankment. Tapo is right which one.
Ans c is correct