2. Size, capacity and materials need be specified for
3. The expected out turn of 12 mm plastering with cement mortar is
4. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
5. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
6. The rate of payment is made for 100 cu m (per % cu m) in case of
7. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
8. The value of 'A' of Indian type W.C. shown in the given figure is:

9. The value of 'C' of Indian type W.C. shown in the given figure is:

10. The value of 'B' of Indian type W.C. shown in the given figure is: