Competitive Exams MCQs
Aptitude
English
Verbal Reasoning
Non Verbal Reasoning
General Knowledge(GK)
General Science(GS)
Data Interpretation(DI)
Banking Awareness
Current Affairs
Subject wise GK MCQs
State Wise GK
History GK
Geography GK
Physics GK
Chemistry GK
Biology GK
Environmental Science GK
Computer Fundatmental MCQs
Computer Fundamentals
Microsoft Word
Microsoft Excel
MS Power Point
Tally
Operating System
Python
AI(Artificial Intelligence)
Join the Discussion
Login to post a comment or share your explanation.
Login10%extra for unevenness and loss =4.4cum
Loose volume =50%extra =4.4*1.5=6.6cum
Volume of cement =6.6/(1+2+4)=0.942cum
Stp1. 1÷7 = 0.1428
Stp2. 2÷7 = 0.2857
Stp3. 4÷7 = 0.5714
All values are multiple and × 4
=0.1428×0.2857×0.5714×4
=0.09324
Assume = 0.094
Ans = 0.94m^3
Wet Qty. of concrete = 100 Sqm * 0.04m thickness = 4.00 Cum
To get the dry volume of concrete, generally wet volume of concrete will be multiplied by 150%.
Therefore 4.00 Cum * 150% = 6.00 Cum.
Cement Qty. = Dry volume of concrete / ( Sum of the ratio values).
= 6.00 /( 1+2+4).
= 0.857 Cum of Cement i.e.25 No. of bags.
But here they considered 164.5% instead of 150%.
Dry volume of concrete = 4 * 164.5% = 6.58 Cum.
Cement Qty. = 6.58/ (1+2+4) = 0.94 Cum