If a rectangular pre-stressed beam of an effective span of 5 meters and carrying a total load 3840 kg/m, is designed by the load balancing method, the central dip of the parabolic tendon should be
A. 5 cm
B. 10 cm
C. 15 cm
D. 20 cm
Answer: Option B
Join The Discussion
Comments ( 5 )
Distribution of shear intensity over a rectangular section of a beam, follows:
A. A circular curve
B. A straight line
C. A parabolic curve
D. An elliptical curve
If the shear stress in a R.C.C. beam is
A. Equal or less than 5 kg/cm2, no shear reinforcement is provided
B. Greater than 4 kg/cm2, but less than 20 kg/cm2, shear reinforcement is provided
C. Greater than 20 kg/cm2, the size of the section is changed
D. All the above
In a pre-stressed member it is advisable to use
A. Low strength concrete only
B. High strength concrete only
C. Low strength concrete but high tensile steel
D. High strength concrete and high tensile steel
In a simply supported slab, alternate bars are curtailed at
A. $${\frac{1}{4}^{{\text{th}}}}$$ of the span
B. $${\frac{1}{5}^{{\text{th}}}}$$ of the span
C. $${\frac{1}{6}^{{\text{th}}}}$$ of the span
D. $${\frac{1}{7}^{{\text{th}}}}$$ of the span
Please solved this guy's..
h = WL/4p,
h = 38.4 x 500/ ( 4 x 480).
h= 10 cm.
Due to UDL total load will divide by 8. And 3840/8=480.
480 will be a prestressing force
Force not given ?
plz anyone solve it
??solution