ExamVeda
Login
Home
51
The core (dia in mm) size obtained with NX size
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
52
Match the following:
1. Thickseam Extraction a. Double Unit Face
2. Bord and Pillar Extraction b. Jet Pearcing
3. Longwall Face Development c. Inclined Slicing
4. Hydraulic Mining d. Half Moon
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
53
The minimum distance between two sections should be if one working at floor and one at top.
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
54
Depillaring operations conducted from dip to . . . . . . . .
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
55
Room and pillar mining employed at depth below . . . . . . . . meters.
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
56
The core sizes whose wire line drilling technique is adopted are for BX holes
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
57
Barrier in between panels is preferably puncture at 'A' number of places. 'A' is given by
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
58
Dewatering can be done by using the drill machines like
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
59
Rock formed by errosion, weathering, transportation and ultimately deposition of pre-existing rock
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
60
Maximum roof exposure for caving is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board