Match the following:
1. Thickseam Extraction | a. Double Unit Face |
2. Bord and Pillar Extraction | b. Jet Pearcing |
3. Longwall Face Development | c. Inclined Slicing |
4. Hydraulic Mining | d. Half Moon |
A. 1-c, 2-d, 3-a, 4-b
B. 1-c, 2-b, 3-c, 4-d
C. 1-b, 2-a, 3-d, 4-c
D. 1-d, 2-c, 3-a, 4-b
Answer: Option A
Related Questions on Coal Mining
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l
Scaffold not required in . . . . . . . . tubbing
A. Over hung tubby
B. Under hung
C. Brick
D. Concrete