The water carriage system of collection of waste product
A. Is cheaper in initial cost than dry conservancy system
B. Requires treatment before disposal
C. Creates hygienic problem
D. All of the above
Answer: Option B
A. Is cheaper in initial cost than dry conservancy system
B. Requires treatment before disposal
C. Creates hygienic problem
D. All of the above
Answer: Option B
The distribution mains are designed for
A. Maximum daily demand
B. Maximum hourly demand
C. Average daily demand
D. Maximum hourly demand on maximum day
Sewage treatment units are designed for
A. Maximum flow only
B. Minimum flow only
C. Average flow only
D. Maximum and minimum flow
A. 4.5 to 6.0
B. 6.5 to 8.0
C. 8.5 to 10.0
D. 10.5 to 12.0
Join The Discussion