What is the task of the Advanced Panel?
A. Test stop running
B. Loading the pages
C. Skewing the results
D. None of the mentioned
Answer: Option A
Solution(By Examveda Team)
In the Advanced panel, you can have the test stop running at document completion. That will tell us when the document.onload event is fired, instead of when all assets on the page are loaded.Related Questions on Performance Measures
How do we define the term Thread?
A. Device that controls input
B. Variable that controls movement
C. Controlled execution of applications
D. All of the mentioned
What does the browser do to set up a TCP/IP connection?
A. TCP one-way handshake
B. TCP two-way handshake
C. TCP three-way handshake
D. None of the mentioned
What does the handshake pass between the browser and the remote server?
A. Synchronize
B. Accept
C. Reject
D. Decline
How does the handshake help the server?
A. Acknowledge
B. Accept the attempt
C. Both Acknowledge and Accept the attempt
D. None of the mentioned
Join The Discussion