2.
Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known.
The present cost of the plant = original cost x (index value/(index value at original cost was obtained)
The most major component of this cost index is

4.
Pick out the wrong statement.