Lead is poured into the joint between two pipes. These pipes may be made of

A. Cast iron

B. Vitrified clay

C. Asbestos cement

D. Concrete

Answer: Option A

Solution(By Examveda Team)

Lead is poured into the joint between two pipes. These pipes may be made of Cast iron
Cast iron has a much higher melting point than lead.

This Question Belongs to Mechanical Engineering >> Engineering Materials