ExamVeda
Login
Home
31
Advance supporting of 30 m at both the gate roads is required due to
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
32
A 15 m3 dragline is deployed in an O.B. bench of an O.C. mine. It works for 40 days at the rate of 6 hrs per shift and 3 shifts a day. The cycle time, bucket fill factor, and operating efficiency of the dragline are respectively 50 s, 0.8, and 75%. The total volume of O.B. in m3 handled by the dragline is
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
33
Mine life time should be calculated based on
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
34
No mode or type of Capping shall be used which fails to withstand a load of atleast "N" times the maximum static load. N is given by
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
35
Over 80% of underground coal production in India comes from
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
36
The following data are provided for a surface mine to be excavated by a shovel:
Production target : 10000 te/shift
Available hours per shift : 6 hrs
Shovel loading cycles per hour : 106
Bank density of the material mined : 2400 kg/m3
Swing factor at 120° swing : 0.91
Bucket fill factor : 0.64
Utilization of available time : 83%
No of working days in a year : 300
No of shifts per day : 3
The annual production target in Mte is
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
37
Select the correct order with respect to the core sizes
Discuss
Answer & Solution
Answer: Option B
Solution:
The correct answer is Option B: NX > BX > AX > EX.
Here's why:
These codes (NX, BX, AX, EX) refer to standard core sizes used in core drilling during mineral exploration and geotechnical investigations.
They represent the diameter of the rock core retrieved from the drill hole.
The letters are in a roughly descending order of size.
* NX core is the largest of the given options.
* BX core is smaller than NX.
* AX core is smaller than BX.
* EX core is the smallest of the given options.
Therefore, the correct order from largest to smallest core size is NX > BX > AX > EX.
38
A non-electric detonating relay does not contain
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
39
Which of the following sampling technique is followed during sampling from wagons or dumps in the form of scoop taken at regular intervals?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
40
Value of Bulking Factor is
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board