The area of working face broken per drill hole is termed as
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
82
The natural and geological conditions of the mineral deposit are as follows
1. ore strength : weak to moderate
2. rock strength : moderate to strong
3. deposit shape : tabular
4. dip : flat
5. depth : shallow to moderate
6. cost of mining : moderate
From the options listed below select the optimal or best suited method possible for the available conditions?
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
83
Which of the following is in vogue to calculating depreciation?
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
84
Gestation period is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
85
As per Indian Electricity Rules, where hand-held portable apparatus is used, the voltage should not exceed
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
86
Extraction to a small sized, irregular and unsystematic underground working is called
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
87
Chances of Over-riding of gallery is most with
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
88
Which of the following type of SDB is placed outbye of the face?
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
89
If the value of ore is Rs. 600 per tonne, production cost Rs. 400 per tonne, and cost of overburden removal Rs. 50 per m3, the break-even stripping ratio in m3/tonne is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
90
Given bench height: 12 m, burden: 4 m, Spacing: 5 m; explosive per hole: 120 kg; density of rock: 2600 kg/m3, the powder factor in tonne/kg is
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board