Pick up the correct statement from the following:
A. If the applied tension to the tape is more than the standard, the tension correction is positive
B. If the applied tension to the tape is less than the standard, the tension correction is negative
C. If the temperature during measurement is greater than the standard temperature, the temperature correction is positive
D. All the above
Answer: Option D
Related Questions on Surveying
Which of the following methods of contouring is most suitable for a hilly terrain?
A. Direct method
B. Square method
C. Cross-sections method
D. Tachometric method
A. 750 mm × 900 mm
B. 600 mm × 750 mm
C. 450 mm × 600 mm
D. 300 mm × 450 mm
A. 22° 30'
B. 23° 27'
C. 23° 30'
D. 24° 0'
Join The Discussion