A bill of material is prepared in case of a . . . . . . . . job.
A. standard job
B. non-standardized job
C. Both A and B
D. None of these
Answer: Option B
Solution (By Examveda Team)
A bill of material is prepared in case of a non-standardized job.A
bill of material (BOM) is a comprehensive list of materials, components, and instructions required to construct, manufacture, or repair a product or service. It includes detailed information about the quantity and type of each item used in the process.Non-standardized jobs are unique and customized tasks that require specific materials and components tailored to the job's requirements. Hence, a BOM is essential for non-standardized jobs to ensure all necessary materials are accounted for and available during production or execution.
Incorrect Options:
Option A: standard job
This option is incorrect because standard jobs typically follow a set pattern and use predefined materials and components. A BOM may not be necessary for such tasks as the required materials are already known and standardized.
Option C: Both A and B
This option is incorrect because a BOM is specifically crucial for non-standardized jobs. While it can be used for standardized jobs, it is not always necessary.
Option D: None of these
This option is incorrect because a BOM is indeed prepared for non-standardized jobs to ensure proper material planning and management.
Example of correct usage:
When a company receives an order to build a custom piece of machinery, a bill of material is prepared to list all the unique parts and materials required for that specific job. This helps in efficient procurement and assembly processes.
Understanding when and why a BOM is prepared is crucial in cost accounting and project management, ensuring that all resources are accurately tracked and managed.

A is right answer