A company has three mines at locations A, B and C, which supply coal to power plants at D, E, F and G. Mines A, B and C produce 1800 t/day, 1700 t/day, and 2900 t/day respectively. Daily raw coal requirements at the power plants D, E, F and G from these mines are 2050 t, 1600 t, 1300 t, and 1450 t respectively. Unit transportation costs are as follows:
Mines ↓ | Power Plants | |||
D | E | F | G | |
A | 3.5 | 4.0 | 2.5 | 5.5 |
B | 4.5 | 3.7 | 6.0 | 4.7 |
C | 4.2 | 3.8 | 5.2 | 2.9 |
A. An unbalanced transportation problem
B. A balanced transportation problem
C. An assignment problem
D. None of the above
Answer: Option B