A continuous supply of goods requires one of the following as a must:
A. The goods must be notified by the Commissioner in this behalf;
B. The contract for supply lasts for a minimum period of 3 months;
C. The supply is made by means of a wire, cable, pipeline or other conduit;
D. Supplier invoices the recipient on a regular or periodic basis.
Answer: Option D
Join The Discussion