A workshop has four machines for assigning four jobs. Each job can be assigned to only one machine. Estimated processing cost (in Rs.) at each machine to complete each task is given in the table below
Machine | |||||
M1 | M2 | M3 | M4 | ||
Tasks | T1 | 61 | 92 | 52 | 72 |
T2 | 42 | 49 | 69 | 85 | |
T3 | 47 | 59 | 80 | 71 | |
T4 | 65 | 70 | 68 | 72 |
The minimum value of total processing cost based on an optimal assignment schedules is
A. 214
B. 220
C. 215
D. 262
Answer: Option B
Related Questions on Mine System Engineering
A. Unique optimal solution
B. Multiple optimal solution
C. Unbounded solution
D. Infeasible solution
Join The Discussion