Borrow pits should preferably be located in
A. Field on the left side of the canal
B. Field on the right side of the canal
C. Fields on both sides of the canal
D. Central half width of the section of the canal
Answer: Option D
Join The Discussion
Comments ( 1 )
Related Questions on Irrigation Engineering
Finally formed berms in canals are provided for
A. Protection of banks erosion by the waves
B. Control of seepage losses
C. Strengthening of banks
D. All the above
Canals constructed for draining off water from water logged areas, are known
A. Drains
B. Inundation canals
C. Valley canals
D. Contour canals
A hydroelectric scheme operating under a head of 80 m will be classified as
A. low head scheme
B. medium head scheme
C. high head scheme
D. none of the above
A. Low sodium water
B. Medium sodium water
C. High sodium water
D. Very high sodium water
explain sir , what is borrow pit in canal?