If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then

A. d = 0.445 a

B. d = 0.557 a

C. d = 0.775 a

D. None of these

Answer: Option C


This Question Belongs to Civil Engineering >> Building Construction