31
For an open pit operation the value of metal is Rs. 210/kg, and recoverable grade is 1.2%. Production cost per tonne of ore inclusive of mining and processing but excluding stripping is Rs. 2000. If the break even stripping ratio is 3.49 m3/te. then the stripping cost is (lte = 1000 kg)
Answer & Solution
Answer: Option
A
No explanation is given for this question. Let's Discuss on Board