Examveda

River training for depth is achieved by

A. groynes

B. construction of dykes or leavees

C. both (A) and (B)

D. groynes and bandalling

Answer: Option D


This Question Belongs to Civil Engineering >> Irrigation Engineering

Join The Discussion

Comments (1)

  1. Narendra Rawat
    Narendra Rawat:
    2 years ago

    D

Related Questions on Irrigation Engineering