Select the correct statement.
A. Nagpur road plan formula take into account the towns with very large population.
B. Nagpur road plan has a target road length of 32 km per 100 square km.
C. Second 20-year plan has provided 1600 km of expressways out of the proposed National highway.
D. Second 20-year plan allowed deduction of length of railway track in the area while calculating the length of roads.
Answer: Option C
Join The Discussion
Comments ( 1 )
Highway facilities are designed for
A. annual average hourly volume
B. annual average daily traffic
C. thirtieth highest hourly volume
D. peak hourly volume of the year
The provision of traffic signals at intersections
A. reduces right angled and rear end collisions
B. increases right angled and rear end collisions
C. reduces right angled collisions but may increase rear end collisions
D. reduces rear end collisions but may increase right angled collisions
In CBR test the value of CBR is calculated at
A. 2.5 mm penetration only
B. 5.0 mm penetration only
C. 7.5 mm penetration only
D. both 2.5 mm and 5.0 mm penetrations
If aggregate impact value is 20 to 30 percent, then it is classified as
A. exceptionally strong
B. strong
C. satisfactory for road surfacing
D. unsuitable for road surfacing
According to this plan, by the end of 1963, it was planned to construct 1600km of roads per 100 sq km area i.e. 5 of different category.