The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.

A. 1-5

B. 20-40

C. 100-150

D. 1000-1500

Answer: Option B