Examveda

Which of the following statements are correct?
1. The total installed capacity of Rajiv Gandhi Thermal Power Station is 1200 MW.
2. The power project is located in Hisar district.
Select the correct answer given below.

A. Only 1

B. Only 2

C. Both 1 and 2

D. None of these

Answer: Option C


This Question Belongs to State GK >> Haryana

Join The Discussion

Related Questions on Haryana