Which of the following statements are correct?
1. The total installed capacity of Rajiv Gandhi Thermal Power Station is 1200 MW.
2. The power project is located in Hisar district.
Select the correct answer given below.
A. Only 1
B. Only 2
C. Both 1 and 2
D. None of these
Answer: Option C

Join The Discussion