At roof slab level over the DPC, __________ are provided.
A. Tiles
B. Concrete
C. P.C.C.
D. Rubber Sheet
Answer: Option A
Solution(By Examveda Team)
Tiles are provided at roof slab level over the DPC to reduce the dampness. The treatment involves the treatment of parapet and roof slab.Related Questions on Building Maintenance
Creep in concrete structure increases with:
A. Increase in humidity
B. Increase in water
C. Decrease in temperature
D. Decrease in humidity
To control corrosion, concrete with _________ is used.
A. Low permeability
B. Low thermal coefficient
C. More cement content
D. More coarse aggregates
Join The Discussion