91. A pebble mill
92. A propeller agitator
93. In a roll crusher, both the rolls
94. The energy required per unit mass to grind limestone particles of very large size to 100 μm is 12.7 kWh/ton. An estimate (using Bond's law) of the energy to grind the particles from a very large size to 50 μrn is
95. Screen capacity is expressed in terms of
96. In case of a hammer crusher, the final product size depends on the
97. Energy consumed for crushing one ton of material ranges from __________ kWh.
98. A 30% (by volume) suspension of spherical sand particles in a viscous oil has a hindered settling velocity of 4.44 μm/s. If the Richardson Zaki hindered settling index is 4.5, then the terminal velocity of a sand grain is
99. Supporting legs of a plate and frame filter is normally made of
100. In classification, particles are said to be equal settling, if they have the same terminal velocities in the