71
The stone whose crushing strength is least, is
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
72
According to National Building Code, the hydrants in water mains is provided at minimum interval of
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
73
The bearing capacity of granite is generally
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
74
Arches in the form of masonry arcs struck from more than four centres, are called
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
75
The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
76
Nogging of a common wooden partition is
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
77
The sill of a common wooden partition is
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
78
In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
79
The skirting/dado in a bath roof should be upto
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
80
For constructing a terrazzo floor, Pick up the incorrect statement from the following:
Discuss
Answer & Solution
Answer: Option C
Solution:
In constructing a terrazzo floor, the statement that glass strips are driven into the layer according to the pattern required is incorrect.

Instead, the glass chips or aggregates are mixed with the terrazzo binder before being spread over the surface, not driven into it.

The correct process involves preparing a base course, laying a thick layer of cement concrete, and then applying the terrazzo mixture on top.

After laying the terrazzo, it is ground to a smooth finish, and oxalic acid is used to enhance the surface's shine.