Construction Planning And Management MCQ Questions & Answers | Civil Engineering
Learn Construction Planning And Management MCQ questions & answers are available for a Civil Engineering students to clear GATE exams, various technical interview, competitive examination, and another entrance exam. Construction Planning And Management MCQ question is the important chapter for a Civil Engineering and GATE students. Page-8 section-1
Each section contains 100 MCQs on
Construction Planning and Management .
Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing. Reason R: If the angle of swing is decreased, the cycle time will be decreased.
Consider the following statements:
In the critical path method of construction planning, Free Float can be.
1. Greater than Total Float.
2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float
A contractor has two options; (l) : Invest his money in project A or (II) : Invest his money in project B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate, he