1.
When the 3-phase system is not grounded and if Single Line to Ground fault occurs, the voltage of the other two healthy phases will

4.
Ground resistance should be designed such that

5.
For an EHV equipment for maintenance first it should be isolated and connected to ground because

6.
The objective of earthing or grounding is

8.
When earth fault occurs