If manufacturing cycle efficiency is 0.725 and total manufacturing time is 45 minute, then value added manufacturing time will be
A. 42.625
B. 36.724
C. 32.625
D. 41.625
Answer: Option C
Solution(By Examveda Team)
Value added manufacturing time = Manufacturing cycle efficiency × Total manufacturing time= 0.725 × 45
= 32.625.