If ‘P’ is the percentage of water required for normal consistency, water to be added for determination of initial setting time, is
A. 0.70 P
B. 0.75 P
C. 0.80 P
D. 0.85 P
Answer: Option D
Join The Discussion
Comments ( 2 )
Related Questions on Building Materials
For the manufacture of plywood, veneers are placed so that grains of adjacent veneers
A. Run at right angles
B. Parallel
C. Inclined at 45°
D. Inclined at 60°
The most important constituent of an oil paint, is
A. Thinner
B. Vehicle
C. Pigment
D. All the above
Stucco paints are suitable for
A. Stone masonry
B. Brick walls
C. Both (A) and (B)
D. Neither (A) nor (B)
this means that if water required for normal consistency is p (amount) then water required for determination of initial setting time of cement is 85 % of the water required for normal consistency which is p