If the intensity of rainfall is more than the infiltration capacity of soil, then the infiltration rate will be
A. equal to rate of rainfall
B. equal to infiltration capacity
C. more than rate of rainfall
D. more than infiltration capacity
Answer: Option B
Related Questions on Irrigation Engineering
Finally formed berms in canals are provided for
A. Protection of banks erosion by the waves
B. Control of seepage losses
C. Strengthening of banks
D. All the above
Canals constructed for draining off water from water logged areas, are known
A. Drains
B. Inundation canals
C. Valley canals
D. Contour canals
A hydroelectric scheme operating under a head of 80 m will be classified as
A. low head scheme
B. medium head scheme
C. high head scheme
D. none of the above
A. Low sodium water
B. Medium sodium water
C. High sodium water
D. Very high sodium water
Join The Discussion