In facultative stabilization pond, the sewage is treated by
A. Aerobic bacteria only
B. Algae only
C. Dual action of aerobic bacteria and anaerobic bacteria
D. Sedimentation
Answer: Option C
Related Questions on Environmental Engineering
The distribution mains are designed for
A. Maximum daily demand
B. Maximum hourly demand
C. Average daily demand
D. Maximum hourly demand on maximum day
Sewage treatment units are designed for
A. Maximum flow only
B. Minimum flow only
C. Average flow only
D. Maximum and minimum flow
A. 4.5 to 6.0
B. 6.5 to 8.0
C. 8.5 to 10.0
D. 10.5 to 12.0
Join The Discussion