?
In method 3 the restoration is done by addition of ____________
Answer & Solution
Correct Answer:
Option
A
Metal sleeve jacket is added in method 3 to do the restoration. In this method preload is applied before the repair of the damaged concrete and removed after the completion of repairs and a metal sleeve jacket is installed around and beyond the damaged area and the gap between the metal sleeve girders is filles with epoxy grout by pressure injection.
Join the Discussion
Login to post a comment or share your explanation.
Login