In the Marmaray Tunnel (Turkey), a significant design challenge was:

Answer & Solution
Correct Answer: Option C
The Marmaray Tunnel crosses the Bosphorus Strait. The main challenge was undersea pressure at depths of up to 60 meters, requiring specially sealed tunnel segments.