PERT analysis is based on
A. Optimistic time
B. Pessimistic time
C. Most likely time
D. All of the above
Answer: Option D
Solution (By Examveda Team)
PERT Analysis. Program Evaluation and Review Technique (PERT) is a method used to examine the tasked that are in a schedule and determine a variation of the Critical Path Method (CPM).It analyzes the time required to complete each task and its associated dependencies to determine the minimum time to complete a project