Pick up the correct method adopted for developing the approximate or conceptual estimates from the following:

A. Base unit method

B. Cost per function method

C. Cost per square metre

D. All of these

Answer: Option D


This Question Belongs to Civil Engineering >> Engineering Economics

Join The Discussion

Related Questions on Engineering Economics