Pick up the correct statement from the following
A. Programmer evaluation and review technique is event oriented
B. Programmer evaluation and review technique is not event oriented
C. Critical path method is event oriented
D. None of the above
Answer: Option D
Solution(By Examveda Team)
Program evaluation and review technique (PERT) is a technique adopted by organizations to analyze and represent the activity in a project,and to illustrate the flow of events in a project.
PERT is a method to evaluate and estimate the time required to complete a task within deadlines.
Join The Discussion
Comments ( 7 )
Related Questions on Industrial Engineering and Production Management
The essential condition for the decompression of an activity is that
A. The project time should change due to decompression
B. After decompression the time of an activity invariably exceeds its normal time
C. An activity could be decompressed to the maximum extent of its normal time
D. None of the above
A. CAM < DAM
B. CAM > DAM
C. CAM = DAM
D. There is no such criterion
None of tha above
. None of the above
option A is correct.
Option A is righ
Option A is right
Option A is correct reply me
Option A is correct reply me