?
The Bandra-Worli Sea Link Bridge was opened for Public in the year
Answer & Solution
Correct Answer:
Option
C
The Bandra-Worli Sea Link Bridge was opened for Public in 2009. The first four of the eight lanes of the bridge were opened to the public on 30th June 2009. All eight lanes were opened on 24th March 2010. The sea-link reduces travel time between Bandra and Worli during peak hours from 20 to 30 minutes to 10 minutes.
Join the Discussion
Login to post a comment or share your explanation.
Login