The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept
A. 0.20 m
B. 1.20 m
C. 2.20 m
D. 3.20 m
Answer: Option B
Related Questions on Irrigation Engineering
Finally formed berms in canals are provided for
A. Protection of banks erosion by the waves
B. Control of seepage losses
C. Strengthening of banks
D. All the above
Canals constructed for draining off water from water logged areas, are known
A. Drains
B. Inundation canals
C. Valley canals
D. Contour canals
A hydroelectric scheme operating under a head of 80 m will be classified as
A. low head scheme
B. medium head scheme
C. high head scheme
D. none of the above
A. Low sodium water
B. Medium sodium water
C. High sodium water
D. Very high sodium water
Join The Discussion