The detention period in a septic tank is assumed
A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes
Answer: Option C
A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes
Answer: Option C
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above
Size, capacity and materials need be specified for
A. Bib-cocks
B. Stop-cocks
C. Ball valves
D. All the above
The expected out turn of 12 mm plastering with cement mortar is
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation
This question focuses on a fundamental design parameter in wastewater engineering. To understand why 30 minutes is the typical answer in this specific exam context, we need to look at how septic tanks actually function.Understanding Detention PeriodThe detention period (or retention time) is the theoretical time that wastewater remains inside the tank before being discharged into the soak pit or drain field.It is calculated using the following formula:$$Detention Period = frac{Volume of Tank}{Rate of Flow}