The hourly variation factor is usually taken as
A. 1.5
B. 1.8
C. 2.0
D. 2.7
Answer: Option A
Join The Discussion
Comments ( 3 )
Related Questions on Environmental Engineering
The distribution mains are designed for
A. Maximum daily demand
B. Maximum hourly demand
C. Average daily demand
D. Maximum hourly demand on maximum day
Sewage treatment units are designed for
A. Maximum flow only
B. Minimum flow only
C. Average flow only
D. Maximum and minimum flow
A. 4.5 to 6.0
B. 6.5 to 8.0
C. 8.5 to 10.0
D. 10.5 to 12.0
Given option is correct
Max daily demand 1.8.
Max monthly demand 1.4.
Max hourly demand 1.5.