?
Which dam faced challenges due to sediment inflow from rapidly eroding catchment?
Answer & Solution
Correct Answer:
Option
C
The Aswan High Dam on the Nile River experienced significant sediment accumulation in its reservoir (Lake Nasser), reducing storage capacity and posing long-term operational challenges.
Join the Discussion
Login to post a comment or share your explanation.
Login